Detour for Frankleigh Street road works (from 28/07/2025 until 11/08/2025)
From Monday 28th July for 15 days the next stage of road works on Frankleigh Street begins, requiring the Route 120 to detour from its usual route.
Buses travelling northbound towards Burnside will follow the normal route to Athelstan St, turn right on to Barrington St, turn left Stourbridge St, and turn right on to Lyttelton St to resume the normal route.
Buses travelling southbound towards Spreydon will follow the normal route to Lyttelton St, turn left Stourbridge St, turn right on to Barrington St, and turn left on to Milton St to resume the normal route.
Several stops will be affected during this detour. Find out if your stop is affected by viewing the detour map.